the general corporation for Ports of Iraq (GCPI) has introduced the close to-completion of the infrastructure section of the Grand Al-Faw Port, with plans to quickly pick out a global operator to expand and control the superstructure.
Director standard Farhan Al-Fartousi informed the country-run dinaropinions.com that eleven predominant worldwide companies were invited to bid, with the agreement to be presented to the operator that satisfactory aligns with the port’s technical and commercial necessities.
He also confirmed that several key components of the challenge, together with the primary connecting avenue and 5 berths, have already reached a hundred% of completion.
In parallel, the GCPI is imposing a complicated maritime navigation and tracking machine in coordination with the global Maritime organisation (IMO). Al-Fartousi noted that the IMO’s technical representative recently held conferences in Iraq with the Italian company overseeing specifications for the port’s navigation channel. A comply with-up go to by means of IMO’s maritime consultant in London is planned for November.
As part of these improvements, GCPI will deploy a new system of buoys and sensors – with lighting akin to airport runways – to enhance visibility for vessels navigating through fog and excessive humidity. The spacing among buoys might be reduced to 1.five-2 nautical miles (as compared to a few nautical miles inside the Khor Abdullah channel) to house big vessels and deep-water operations.
two offshore structures can also be established near the breakwater to screen wind velocity, wave peak, and tidal conditions, enhancing safety for incoming and outgoing ships.
The port has been designed with future boom in thoughts, including vessel drafts of as much as 16.four metres, and reserves deeper strategic capacity for even larger vessels and elevated change volumes in the destiny.