The Ministry of strength particular its plan to put together for the summer nowadays, Friday, while indicating that the plan is accelerating and operates on a 24-hour gadget.
The spokesman for the Ministry of electricity, Ahmed Musa, said in a announcement observed by the / dinaropinions.com, that “high Minister Mohammed Shia Al-Sudani is supervising the Ministry of power’s plan to prepare for the summer time within the field,” noting that “there is tremendous interest from the high Minister in this file by using providing economic allocations and granting powers to the ministry in order to finish the plan quickly in training for the summer time.”
He added that “further to this extended plan, there’s a strategic line that is embodied inside the qualitative initiatives with a purpose to gain leaps in strength manufacturing, along with massive and qualitative initiatives to growth manufacturing stations, further to drawing up included technical maps to expand the transportation zone and additionally modernize the distribution sector and its networks, as well as projects to finish the connection and mixed cycles, as well as solar power tasks and also getting ready gasoline fields, further to working on organising steam stations with a ability of (1500) megawatts,” indicating that “all of these projects are taken into consideration plans and strategies to assist the popularity of the power device.”
Mousa talked about that “the expanded plan that the Ministry of strength is running on consists of three shifts, i.e. 24 hours of work, and it’s far an expanded step to complete the readiness of the stations to produce energy, and that the scheduled and periodic upkeep is complete in order that the stations are fully organized,” noting that “the plan additionally blanketed the transportation region, the readiness of the lines, the installation of stations, and the set up of energy transformers inside the transformer stations to amplify their overall performance and obtain sufficient bendy hours to switch loads between the governorates in step with time ceilings, in order to be finished on the first of next may also.”