
Trial production has started at the Amara Gas Separation Station, operated by Maysan Oil Company, with an initial output of 3,000 barrels per day.
Maysan Oil Company Director General Hussein Kazem La’ibi said the station is following a phased plan to gradually increase production. The target is to reach 8,000 barrels per day within the coming days.
According to the Ministry of Oil, the aim is to stabilize production at 8,000 barrels per day and help increase the company’s overall production capacity.